Artificial lift PCM

PCM DST - Beispiele von der Förderung zur Produktion

PCM DST solutionsWELL TEST CAMPAIGN WITH PCM PCPs

PCM was selected to participate in a 3-years DST exploration campaign and provide artificial lift solutions for challenging well conditions.

Each of the 5 well zones was tested for approximately 80 hours. The successful results obtained led the client to use PCM PCPs in the field for production.

CLIENT TESTIMONIAL

“Well Testing with PCM Progressive Cavity Pump has enabled us to clean up our low pressure heavy oil wells quickly. We have saved rig time, avoided the use of nitrogen and swabbing during clean-up, and by raising the rotor from the stator we have in addition been able to test our wells under natural flow conditions and obtain useful reservoir data. The system has  proved simple to install and reliable in operation.”
Hubert Youngs
Well Test Director

BENEFITS

  • 20 Wells / 100 Zones Tested
  • Accurate IPR Calculated
  • Safe & Simple Operations
  • No Swabbing & Nitrogen For Well Clean-Up
  • Natural Flow Possible
  • Low Power Consumption
  • No Foaming / No Gas or Sand Lock
  • Easily Transportable

CHALLENGE

  • Testing of 5 Zones Per Well
  • Paraffinic, Sandy & Gassy Wells
  • Light to Heavy Crude
  • Low Pressure
  • Limited Logistics
  • Power (Mobile Generator Set)

CONTEXT

Client: E&P company
Location: East Africa
Well Type: Multizones, Vertical & Horizontal